Water Insulation Polyurethane For Bathrooms and Kitchens From Al Zamil Company
(1186 Product Views)
Water insulation Polyurethane for Bathrooms and Kitchens, installation and supply service from Al Zamil Company, Instructions must be followed not to install plumbing extensions except after insulation work, and to install ceramic tiles on the walls, except for the last tile, which is not installed until after insulation. The floors must also have a smooth surface to receive waterproofing, and lintels must be made on the bathroom doors.
Product description
Water insulation Polyurethane for Bathrooms and Kitchens, installation and supply service from Al Zamil Company, Instructions must be followed not to install plumbing extensions except after insulation work, and to install ceramic tiles on the walls, except for the last tile, which is not installed until after insulation. The floors must also have a smooth surface to receive waterproofing, and lintels must be made on the bathroom doors.
- Work steps: Two waterproofing layers of polyurethane materials of medium thickness of 1.2 mm shall be painted
- After isolation:
- Leave the insulation to dry completely
- Protect the insulation well with a layer of plaster or smooth concrete