Water Insulation  Polyurethane  For Bathrooms and Kitchens   From Al Zamil Company

Water Insulation Polyurethane For Bathrooms and Kitchens From Al Zamil Company

(1264 Product Views)

YouMats

Water insulation Polyurethane for Bathrooms and Kitchens, installation and supply service from Al Zamil Company, Instructions must be followed not to install plumbing extensions except after insulation work, and to install ceramic tiles on the walls, except for the last tile, which is not installed until after insulation. The floors must also have a smooth surface to receive waterproofing, and lintels must be made on the bathroom doors.

in stock
general.mada
general.master_card
general.visa
general.tamara

Product description

Water insulation Polyurethane for Bathrooms and Kitchens, installation and supply service from Al Zamil Company, Instructions must be followed not to install plumbing extensions except after insulation work, and to install ceramic tiles on the walls, except for the last tile, which is not installed until after insulation. The floors must also have a smooth surface to receive waterproofing, and lintels must be made on the bathroom doors.

  • Work steps: Two waterproofing layers of polyurethane materials of medium thickness of 1.2 mm shall be painted
  • After isolation:
    - Leave the insulation to dry completely
    - Protect the insulation well with a layer of plaster or smooth concrete

Our Clients